
Scaffolding Inspection Services in Saudi Arabia
System, tube-and-coupler and mobile scaffolds, inspected and tagged before use and while in service.
Inspections we provide
Independent scaffolding inspection in Saudi Arabia: handover, weekly and post-alteration checks of system, tube-and-coupler and mobile scaffolds, with tagging.
- 01
Handover inspection
Before first use and after erection.
- 02
Periodic inspection
Every seven days, and after alteration or bad weather.
- 03
After modification
Re-inspection after re-assembly or a change of use.
- 04
Before dismantling
Readiness checks before the scaffold comes down.
StandardsSASO 329 · BS EN 12811 · TG20:21
What we check
- Base, sole plates and foundation
- Plumb, level, couplers and bracing
- Guardrails, mid-rails and toe boards
- Platforms, full boarding and access
- Ties to the structure, load class and signage
- Tagging and a report with photos
What you receive
- A structured report: scope, method, findings and photos
- Defects ranked by priority, with practical recommendations
- Certificate or verification record where applicable
- Re-inspection after repairs, on request
Accreditations for this service
SAAC accreditedInspection body · ISO/IEC 17020N-I-00043 · valid to Jul 2029
LEEA full memberLifting equipmentNo. 10156 · valid to Jan 2027
ISO 9001 · 14001 · 45001Certified by TNV GlobalValid to Nov 2027
Related services
-
Pressure vessel & piping inspectionAir receivers, boilers, safety valves, piping and gas lines.View
-
Earthmoving equipment inspectionExcavators, loaders, bulldozers, backhoes and graders.View
-
Fall protection inspectionLifelines, anchors, harnesses and self-retracting lifelines.View
All of site & industrial equipmentField guide: TG20:21 scaffold checks
Request a quote for scaffolding inspection
Tell us the equipment and the site. An engineer replies today with the scope, price and a date.
