Talk to an engineer +966 53 972 2994
العربية Request a quote

How Our Inspection & Reporting Process Works

Five steps from your request to a usable report, with the timings we keep.

  • Same dayQuote reply
  • Day 1–2On site
  • Day 3–5Report issued
  • 24 hUrgent jobs

Working days, Sunday to Thursday.

Most reports are issued on working day 3–5.

Five steps

  1. 01

    Tell us what you need

    Asset or equipment details, location, project stage and the outcome you need.

  2. 02

    Scope confirmation

    We agree the scope, applicable requirements, timeline and deliverables.

  3. 03

    Proposal & PO

    You approve the proposal and issue the purchase order.

  4. 04

    Service execution

    Our qualified team does the work with the right procedures and equipment.

  5. 05

    Receive usable results

    Report, certificate, training record or calibration certificate, as agreed.

What helps us quote

  • Equipment or asset type and quantity
  • Work location and preferred date
  • Applicable standard or client specification
  • Previous reports, drawings or equipment lists

What you receive

  • A structured report: scope, method, findings and photos
  • Defects ranked by priority, with practical recommendations
  • Certificate or verification record where applicable
  • Re-inspection after repairs, on request
Download the PDFPDF · Inspection services

Request a quote

Tell us the equipment and the site. An engineer replies today with the scope, price and a date.

WhatsApp an engineer