Talk to an engineer +966 53 972 2994
العربية Request a quote
TUV SMAT inspector checking a crane hoist and its wire rope on site

KSA · Bahrain · GCCUSA · Sister company AIA Inspection

Inspection, NDT, Calibration & Training in Saudi Arabia

For industrial projects in Saudi Arabia, Bahrain and across the GCC.

  • Accredited & compliantMeeting international and local standards
  • Fast response & schedulingKeep your projects on track
  • Engineer-led servicePractical, experienced and solutions-focused

Trusted by

  • SABIC
  • Ma’aden
  • Saudi Electricity Company
  • Nesma & Partners
  • El Seif Engineering Contracting
  • Archirodon
  • Saipem
  • Rawabi Vallianz
  • Al Robaya Holding
  • Abahsain Consolidated

From request to report

  1. QuoteSame day
  2. On siteDay 1–2
  3. Report issuedDay 3–5

Working days, Sunday to Thursday. Urgent jobs within 24 hours.

Our services

Four service lines from one technical partner. Open one, or download its PDF sheet.

  • Inspection services

    Cranes, elevators, MEWPs, scaffolds and pressure vessels.

  • NDT services

    Visual, ultrasonic, penetrant and magnetic testing.

  • Calibration services

    Pressure, temperature, electrical and mass instruments.

  • Training services

    Operator, rigging, scaffolding and safety courses.

TUV SMAT engineers discussing a scaffold inspection on site
TUV SMAT inspection sticker

Why TUV SMAT

Accredited, independent and led by engineers.

  1. Competitive pricingA clear proposal based on the confirmed scope.
  2. ImpartialIndependent of suppliers and contractors.
  3. No shortcutsWe held a crane certificate 48 hours until it was safe.
20+years of experience
8,250+projects inspected
4offices in KSA & Bahrain

What our clients say

What contractors and site teams say about our work.

  • The expertise, integrity, and professionalism demonstrated by the TUV SMAT team are sincerely appreciated.

    Nesma & PartnersThe Avenues (AVR‑1), Riyadh · signed by the Site HSE Manager and Project Manager
    Certificate of appreciation
  • We would like to extend our sincere appreciation for their excellent technical expertise, safety, quality, dedication and hard work.

    ArchirodonProject Manager · King Salman maritime complex (KSIC), 2021
    Certificate of appreciation
  • TUV SMAT’s government-approved status gave us full confidence. Their inspection reports are accepted across all regulatory bodies, saving us months of delays.

    Ahmed Al-RashidProject Director, NEOM Infrastructure
  • The MEWP inspection team identified a critical hydraulic issue before operation. Their load testing and certification gave us total peace of mind on site.

    Omar Al-HarbiFleet Manager, Al-Rushid Construction
  • TUV SMAT’s gas line inspection detected micro-leaks that others missed. Their advanced pressure testing helped us avoid a major incident.

    Nadia Al-ShehriSafety Supervisor, Saudi Gas
  • Their scaffolding inspection ensured full TG20:21 compliance. The structural audit gave us the confidence to proceed with a high-risk refurbishment.

    Khalid Al-DossarySite HSE Lead, Bechtel KSA
  • Critical anchor pull-out tests were delivered with precision. TUV SMAT’s load testing certification allowed us to secure final sign-off from Aramco.

    Faisal Al-QahtaniProject Engineer, SABIC
  • The operator safety training transformed our workforce. Competency exams and hands-on sessions were world-class, and now our team is fully certified.

    Sarah Al-GhamdiHSE Manager, Petro Rabigh
  • TUV SMAT’s NDT (UT, MT, RT) uncovered weld defects that could have led to failure. Their advanced scanning saved us millions in potential repairs.

    Dr. Yasser Al-MalkiNDT Coordinator, Ma’aden
  • Thorough cradle and BMU inspection: they identified worn suspension ropes that were overdue for replacement. We now have a safe maintenance plan.

    Layla Al-JadaanFacilities Director, KAFD
  • The drop survey delivered precise dimensional control. Their DROPS prevention study helped us secure offshore certification with zero rework.

    Hamad Al-OtaibiMarine Ops, Aramco Offshore
  • Their ISO 9001 audit and certification support was seamless. TUV SMAT’s gap analysis helped us achieve accreditation three months ahead of schedule.

    Ibrahim Al-RajhiQuality Manager, Al Rajhi Holding
  • Comprehensive elevator and escalator load tests and safety gear inspection. TUV SMAT’s report gave us the green light for operation across 5 high-rise towers.

    Noura Al-FayezAsset Manager, Roshn
  • TUV SMAT’s supplier prequalification saved us from onboarding a non-compliant vendor. Their technical assessments are thorough and unbiased, a must for any major project.

    Tariq Al-GhamdiProcurement Lead, Red Sea Global
  • Horizontal and vertical lifeline inspection was executed perfectly. Their fall protection certification allowed our rope access teams to work safely at height.

    Mansour Al-ZahraniSafety Director, NEOM Mountain

Client appreciation

01/ 02

Nesma & PartnersAppreciation certificate

Granted for our work as Third-Party Inspection Authority on The Avenues Riyadh project, 2022 to 2026, citing safety, quality assurance and regulatory compliance.

Project
The Avenues (AVR‑1), Riyadh
Role
Third-Party Inspection Authority
Period
2022–2026
Nesma & Partners, Appreciation certificate

ArchirodonCertificate of appreciation

Awarded to TUV SMAT for inspection work on the King Salman maritime complex, citing technical expertise, safety and quality.

Project
King Salman maritime complex (KSIC)
Year
2021
Issued
29 March 2022
Archirodon, Certificate of appreciation

Verify before you hire

Check any TUV SMAT certificate online. Our approvals are ready for your vendor file.

  • SAAC accreditedInspection body · ISO/IEC 17020N-I-00043 · valid to Jul 2029
  • LEEA full memberLifting equipmentNo. 10156 · valid to Jan 2027
  • ISO 9001 · 14001 · 45001Certified by TNV GlobalValid to Nov 2027
  • TVTC licensedTraining facilityNo. 19187335025010
All accreditations and certifications

Certificate checkFree · No login

Enter the number printed on your certificate.

Example of a result

ValidMobile crane · thorough examination

SMAT-IC-2026-01482

Issued 14 Mar 2026 · Valid until 13 Mar 2027

Secure lookup over HTTPS

Or check it in the TUV SMAT verification portal
  1. 01Enter the numberAs printed, including the year.
  2. 02Match the detailsEquipment and dates must match the paper.
  3. 03Keep the recordSave or print the result for your audit file.

Certifications & Accreditations

  • Download now
  • SAAC accreditation, ISO/IEC 17020N-I-00043 · valid to 2029ViewDownload
  • ISO 9001:2015 certificateCB-MS-2207 · valid to Nov 2027ViewDownload
  • ISO 14001:2015 certificateCB-MS-2206 · valid to Nov 2027ViewDownload
  • ISO 45001:2018 certificateCB-MS-2208 · valid to Nov 2027ViewDownload
  • LEEA full membershipNo. 10156 · valid to Jan 2027ViewDownload
  • TVTC training facility licenceNo. 19187335025010ViewDownload
  • Calibration lab, ISO/IEC 17025 (GEOSAR)IAS CL-288 · valid to Jul 2027ViewDownload

Need another document for your vendor file?info@smat-ins.com

On requestSent by email

  • Commercial RegistrationCR 2051234777Request

Approved vendor with 25 organisations

Vendor numbers as issued by each organisation.

  • Saudi Aramco0003870
  • SABIC11056769
  • NEOMS10606171
  • Ma’aden20231621
  • Saudi Railways3928
  • QiddiyaS11169684
  • SEVENS11344559
  • Sadara Chemical1000005511
  • TasneeS11390546
  • MODON5374
  • National Water44915
  • SCECOVD026977
  • Nesma & PartnersLS-005059
  • Nesma IndustrialLS-415835
  • SpacemakerLS-002654
  • CCC14376
  • El Seif9268266
  • SARACO216554
  • Al Yamama10012765
  • Zamil Group13868
  • Isam KabbaniV-0000011012
  • Dayim EquipmentV15971
  • SISCOAP-71466
  • Atlas Copco210010277
  • Petrolube16476

From Saudi Arabia to the GCC

Three offices in Saudi Arabia, a branch in Bahrain, project support across the GCC and a sister company in the USA.

  • 3Offices in Saudi Arabia
  • 1Branch in Bahrain
  • GCCProject coverage
  • USASister company

Saudi ArabiaHead office and two branches

  • Al Khobar Head office

    Eastern Province

    Al Khobar · Dammam · Dhahran · Jubail · Al Ahsa

    Building 7722, Al Khobar
  • Riyadh Branch

    Central & Northern Region

    Riyadh · Al Kharj · Buraidah · Ha’il · Arar

  • Jeddah Branch

    Western & Southern Region

    Jeddah · Makkah · Madinah · Tabuk · Abha · Jizan

BahrainBranch

  • Bahrain Branch

    Kingdom of Bahrain

    Manama · Muharraq · Sitra · Hidd

GCC coverageProjects supported where applicable

  • UAE
  • Qatar
  • Kuwait
  • Oman
Arabian GulfRed SeaKuwaitQatarUAEOmanRiyadhJeddahAl KhobarHead officeBahrainBranch
  • Head office
  • Branch
  • Bahrain branch
  • GCC coverage

Before you book

Can't find your question? An engineer will answer it on WhatsApp.

WhatsApp an engineer

All FAQs

Yes. We provide inspection, NDT, calibration and training independently within the agreed scope, and disclose any potential role conflicts where applicable.

We use appropriate work procedures, checklists, internal review, a documented scope and stated limitations, so results are consistent and traceable.

The service, the asset or equipment type and quantity, the work location, your schedule, the applicable standard or specification, and any project requirements.

Yes. Enter the certificate number in the TUV SMAT verification portal, linked from the Verify a certificate page. Contact our Quality Assurance team if a number is not found.

We issue inspection and test reports and verification records within our agreed scope. Any certificate of conformity or regulatory acceptance is issued where applicable, within the approved requirements of the project or authority.

By the scope of the assignment, the number of assets, the location, the technical requirements and the reporting needed. You receive a clear proposal based on the confirmed scope.

We follow safe work procedures, coordinate site access and comply with the site- and task-specific safety requirements.

Yes, through our Bahrain branch, and for GCC projects in the UAE, Kuwait, Oman and Qatar where applicable, subject to service availability, local requirements and project conditions.

Get a quote

Tell us which equipment needs inspection and where it is located. We confirm the scope, documents and dates the same day.

  1. Share your requirementsEquipment type, site location and any project requirements.
  2. Agree scope and dateThe work, documents, price and date, confirmed in writing.
  3. Receive clear findingsReport on working day 3–5, explained in plain language.

Sunday–Thursday, 8:00 a.m.–5:00 p.m. (KSA time)

Feedback or a complaint? Tell our Quality Assurance team.

Your inspection request

Takes about a minute.

Add details or files (optional)

SVG, PNG, JPG or PDF · up to 50 MB per file

We only use your details to answer this request.

WhatsApp an engineer